- 10What Breeze.AI is and how it works
- 11When are specifications not enough?
- 12Where is the state of the work kept?
- 13Who prepares a change before coding starts?
- 14What does impact analysis tell you, and when does it run?
- 15How do coding agents use the graph?
- 16How is each change checked, and how does the graph stay current?
- 17Who decides which work agents do?
- 18How do managers see what people and agents are doing?
- 19What happens across many products?
- 20What about existing systems and technical debt?
- 21What changes for the team?
- 22What results have teams seen?
Home / Follow the story / Scene 13: Who prepares a change before coding starts?
Transcript
13. Who prepares a change before coding starts?
With AI, writing code is fast, so preparing good specifications becomes the slowest step. The methodology gives that work its own sprint, the spec sprint, which runs a step ahead of the implementation sprint. The custodians meet for one or two days and work through several requests together. The product owner drafts the specification from a standard template. Impact analysis reports everything the specification will touch. Each custodian reviews the report for their own layer: functional, design, architecture and code. Impact analysis can show that a change needs new items, and the custodians propose them in the specification; the items enter the graph only when their code merges. The finished specification, with its impact report, goes into the implementation backlog. The implementation sprint works from specifications whose risks are already known. A specification that turns out to be missing context goes back to the spec sprint.
On the site: Why a Separate Cadence · The Mechanics · What Happens in a Spec Sprint
Choose a path
The full video in six parts and an appendix, one part at a time.